国产美女高潮视频A片一区,久久超碰免费论坛,日日摸日日舔,久久久老鸭窝laoyawo91

Hotline:400-880-1556

English




Mobile power KC certification implementation standards

Author:中認聯(lián)科 time:2020-07-20 Ctr:1851

Mobile power KC certification implementation standard: KC62133

 image.png

Test items:

1. High Temperature Storage

2. Temperature Cycling Test (Temperature Cycling Test)

3. External Short Circuit Test (External Short Circuit Test)

4. Crushing of Cells

5. Cell Protection Against a High Charging Rate (Cell Protection Against a High Charging Rate)

6. Overheating test (Thermal Abuse Test)

The following documents need to be submitted when applying for KC certification:

A. Certification application;

B. Parts list;

C. Electrical wiring diagram;

D. Specification of safety components;

E. Product Manual;

G. Authorization document of the agent

Factory inspection

1. The first factory inspection

After accepting the product certification application, it is necessary to conduct the first factory inspection of the factory and conduct a preliminary evaluation of the factory's quality control system.

(1) Product change control procedures (e.g., after the certified product change application is approved by the certification body, the corresponding technical documents shall be formulated in strict accordance with the approved change content and issued to the relevant departments to correctly implement the certified product change. Not approved For approved changes, certification marks cannot be applied to the changed products.);

(2) Document and data control procedures;

(3) Quality record control procedures (the retention period of the purchase, routine and operation inspection records is at least 3 years);

(4) Routine inspection and confirmation inspection procedures;

(5) Control procedures for unqualified products;

(6) Inspection or verification procedures for key components and materials;

(7) Internal quality audit procedures;

(8) Process work instructions, inspection standards, instrument and equipment operating procedures, management systems and other procedures. The factory should keep at least the above quality records to verify that the factory has indeed carried out all production inspections and production tests. The quality records should be true and effective ;

(9) Product routine inspection and confirmation inspection records; purchase inspection/verification records of key components and materials and qualification certificates provided by suppliers.

If you need the above testing and certification, you can call our company ZRLK to inquire about the specific cost and cycle. There are professional engineers here to provide a full range of technical services such as testing, certification, appraisal, technical consultation, and solutions for corporate customers. ZRLK has focused on testing and certification of batteries and peripheral consumer products for 15 years, always paying attention to changes in national regulations, and providing customers with one-stop certification services in multiple countries and regions to ensure that your products quickly enter the target market.

image.png


Related Articles
  • UN38.3 Certification: The "International Pass" for the Export of Pouch Batteries

  • CCC Certification for Pouch Batteries: How to Enhance Product Quality and Market Competitiveness

  • Attention! Several safety and energy efficiency resolutions have been issued in Argentina

  • News Express | EU REACH Annex XVII adds Item 50a restriction on polycyclic aromatic hydrocarbons (PAHs)

Follow Us
欧美大肥婆大肥BBBBB| 你懂得日韩| HEYZO久久久| 717理论片午影院无码| 国产 99 在线观看| 日本欧美一区二区三区高清| 欧洲爆乳内射免费| 亚洲乱亚洲乱妇20p| A级免费影院| 日本中文字幕亚洲乱码| 欧美在线视频888| 在线免费观看毛片| 成人国产三级| 莱阳市| 国产精品之久久| 午夜激情丁香六月| 欧美午夜成人电影| 久久99亚洲精品网| 欧美日韩中文综合精品| 国产成人影院| 久久人妻碰天天操| 人妻一区在线| 久久久人妻12P| 久久伊人热视频| 国产精品麻豆欧美日韩WW| 久久机热干肥婆| 亚洲 欧美 久久| 狠狠亚洲婷婷综合久久久| 欧美日韩人妻熟妇| 在线天堂AV-区二区| 99久久精品无码一区二区M男| 超碰91麻豆| tt134.COM| 亚洲美女一区二区三区| 五月丁香综合啪啪视频| 四川一级护士一级毛片| 久久术日本| 激情人妻网| 成人性电影导航| 69一区| 亚洲地址一|